SepticNear Pump-Out Reminder

Tennessee septic permit requirements

Statewide program run through TDEC Environmental Field Offices, except nine contract counties that run their own septic programs: Blount, Davidson, Hamilton, Jefferson, Knox, Madison, Sevier, Shelby and Williamson.

  • Issuing agency: Tennessee Department of Environment and Conservation (TDEC), Division of Water Resources
  • Sourced from the agency itself

The permit process, step by step

StepWhat it involves
1. Soil evaluationTDEC may request a soils map from a private soil consultant. Soil consultants must be approved by TDEC, and the Division publishes the approved list. Large conventional systems and alternative systems also need a design by a licensed engineer.
2. Septic System Construction PermitRequired before any subsurface sewage disposal system is installed and before a faulty system is repaired. Apply online or on form CN-0971 to your Environmental Field Office. Review generally takes 10 days and must be finished within 45 days. The permit expires three years after it is issued.
3. InstallationAnyone in the business of installing, altering, extending or repairing septic systems needs an annual TDEC installer permit, earned by passing a test with a score of at least 70 percent. Installer permits are valid statewide.
4. Final inspectionWhen installation is complete, the installer contacts the local TDEC Environmental Scientist to schedule a final inspection before the system is covered.

Source: www.tn.gov. rules change; confirm with the agency before starting work.

What trips people up

  • In the nine contract counties, apply through the county program, not TDEC. Those counties may require an additional local permit from installers.
  • Installer and pumper permits expire every December 31 and must be renewed each year, so confirm a contractor's permit is current.
  • Septic tank pumping requires a separate annual TDEC pumper permit, which includes a truck inspection through the Environmental Field Office.
  • A property owner or tenant may do the work at their own residence without an installer permit, but still needs the construction permit.
FeeAmount
New conventional system permit, up to 1,000 gallons per day$400, plus $100 per additional 1,000 gallons per day
Conventional construction inspection$100
New alternative system permit, up to 1,000 gallons per day$500, plus $150 per additional 1,000 gallons per day
Alternative construction inspection$200
Experimental system permit$500
Repair permitNo permit fee; $100 repair inspection

Common questions

Who issues septic permits in Tennessee?

Tennessee Department of Environment and Conservation (TDEC), Division of Water Resources. Statewide program run through TDEC Environmental Field Offices, except nine contract counties that run their own septic programs: Blount, Davidson, Hamilton, Jefferson, Knox, Madison, Sevier, Shelby and Williamson.

Do I need a soil or percolation test?

TDEC may request a soils map from a private soil consultant. Soil consultants must be approved by TDEC, and the Division publishes the approved list. Large conventional systems and alternative systems also need a design by a licensed engineer.

Can I install my own septic system in Tennessee?

Installation is restricted to licensed or registered installers in nearly all cases.

Never forget a pump-out again

How often a tank needs pumping depends on how many people it serves, and nobody remembers the date. Tell us when yours was last pumped and we'll text you when it's due, with vetted local pros ready to book.

Free. One text when service is due. No spam, cancel anytime. Privacy

Find septic pros Set reminder